A Libyan Energy Group

The energy of Libya's next chapter.

Ghibli Energy is a Libyan energy group operating across upstream development, oilfield services, and renewable power — a qualified Libyan team delivering with proven international partners.

0
Billion barrels — Africa's largest proven reserves
0
Hours of sunshine per year across Libya
0
Libyan, headquartered in Tripoli
The Group

Built in Libya, for the reopening of its energy sector.

After a generation of underinvestment, Libya's energy sector is reopening: new exploration licensing, field redevelopment programmes, and national demand for power and infrastructure. Ghibli exists to carry that opportunity — as the Libyan partner of record for international operators, service companies, and technology leaders entering the market.

How We Choose Work

If it's not good for everyone, we don't take it.

We're building a company that will still be here in thirty years. That only happens if every project we take on leaves the client, the country, and our own people better off. If a deal only works because someone else is losing, we don't want it.

Partnerships

International capability, delivered in Libya.

Ghibli works as the Libyan partner of established international groups — combining their technology, capital, and delivery record with Libyan ownership and an experienced team on the ground.

Geo-Jade Petroleum
Upstream Partner — Libya

Listed international exploration and production company; our partner for field development and redevelopment in Libya.

DAS Solar
Solar Technology Partner — Libya

Tier-one global manufacturer of high-efficiency solar modules; our technology partner for utility-scale and distributed solar in Libya.

PowerChina Guizhou Engineering Co., Ltd
EPC & Infrastructure Partner — Libya

A subsidiary of Power Construction Corporation of China, one of the world's largest infrastructure EPC groups; our engineering and construction partner in Libya.

How We Work

The standard we hold ourselves to.

01

Libyan Content

We build local teams, local supply chains, and lasting Libyan capability on every project.

02

Regulatory Fluency

Deep working knowledge of Libya's licensing, approvals, and compliance landscape — projects move because the process is done properly.

03

International Delivery

Every mandate is delivered with an established international partner, to the standard their name requires.

04

Safety & Integrity

HSE and compliance are conditions of doing business — zero-harm operations and clean governance, without exception.

Work With Ghibli

Entering the Libyan market? Start with the right partner.

Division 01 — Upstream

Developing Libya's reopening upstream.

Libya holds the largest proven oil reserves in Africa, with a significant share held in fields discovered decades ago and never brought to full development. New exploration licensing and field redevelopment programmes are now bringing that acreage forward. Ghibli enters as a Libyan partner — sourcing and structuring opportunities, carrying subsurface and commercial work in-house, and bringing in international operators where the scale of a development calls for it.

Operating Model

We take fields from standstill to first oil.

Libya's fields have long histories, and institutions that know them deeply. A revival needs an operator prepared to do the work properly — with the state, on the ground, for the long term. That is the company we are building, around people who have spent their careers producing from Libyan fields.

01

Asset Focus

Prioritising mature, under-developed acreage in the Sirte and Murzuq basins, where production history, standing infrastructure, and existing data shorten the path back to first oil.

02

Operational Restoration

Applying reservoir engineering and in-country operating experience to rehabilitate producing assets and recover the barrels that earlier development left behind.

03

Field Delivery

Executing remote-site programmes with Libyan crews and affiliated contractors — hoist campaigns, flowline and facility reinstatement, produced-water handling — inside HSE and QA/QC systems built for distance, heat, and hard ground.

04

National Capability

Building Libyan capability on every mandate through structured on-the-job training, defined competency progression, and supplier development that brings domestic vendors into auditable supply chains — so operating knowledge accumulates in Libya.

International Partnership

Working with foreign operators and technology providers who bring capital and capability, under Libyan ownership and with Libyan operating personnel — anchored today by our partnership with Geo-Jade Petroleum, a listed operator producing 40,000 barrels per day.

Institutional Alignment

Structuring every interest within the EPSA framework, in coordination with the National Oil Corporation and the Ministry of Oil and Gas.

Geological map of Libya showing the Ghadames, Murzuq, Sirte, Cyrenaica and Kufrah sedimentary basins
Libya's five sedimentary basins — Ghadames, Murzuq, Sirte, Cyrenaica and Kufrah.
Workover rig on location at Gialo Field 59, Sirte Basin, Libya
Workover operations at Gialo Field 59, Sirte Basin — operated by Waha Oil Company.
Delivered With

GeoJade Petroleum — our international upstream partner in Libya.

A listed exploration and production company with international operating experience, partnering with Ghibli on field redevelopment and future licensing in Libya.

Discuss Upstream
Division 02 — Oilfield Services

Keeping Libya's assets producing.

Libya's wells and facilities have produced for decades, and the work ahead is technical: wells to be drilled and completed, output to be restored, equipment to be certified. Ghibli Oilfield Services brings that capability to Libyan operators — international-grade well services, contracted through a single Libyan counterparty and delivered in-country.

Service Lines

The life of a well, covered end to end.

01 — Construct

Well Construction

Executing drilling programmes with directional packages, downhole tools, and rig-site engineering — crews and equipment mobilised into the field against a defined well plan.

02 — Complete

Completions & Sand Control

Running cemented liner hangers, sand screens, and gravel-pack completions engineered for sand-prone reservoirs.

03 — Stimulate

Stimulation & Intervention

Restoring deliverability through coiled-tubing intervention, acidising, and multi-stage fracturing, matched to reservoir pressure and completion type well by well.

04 — Sustain

Production Chemistry

Supplying treatment chemistry across the production system — drilling-fluid additives, cementing admixtures, demulsifiers, and flow-assurance products — to protect equipment and hold rate.

05 — Recover

Flare Gas Recovery

Recovering flared and scattered gas through modular capture, compression, and treatment units — turning routine flaring into fuel, power, and revenue.

06 — Assure

Inspection & Integrity

Inspecting tubulars, wellheads, pipelines, and pressure systems through non-destructive testing and online condition monitoring, with documentation ready for the operator's records.

Equipment & Asset Solutions

Providing drilling tools, workover units, coiled-tubing spreads, and surface equipment on rental terms, with online condition monitoring where the operation calls for it.

Delivery Model

Contracting as the single Libyan counterparty — international service capability brought in under Ghibli's local establishment, with registration, mobilisation, and logistics handled in-country.

Division 03 — Renewables

Powering Libya with its own sun.

Libya runs its grid on subsidised fuel while holding some of the strongest solar resource on earth. Ghibli Renewables develops the exchange — grid-scale solar and rooftop generation, carried in Libya by a qualified Libyan team, with international partners and infrastructure finance brought in where the scale of a project calls for it.

0
kWh/m² a year — irradiation in Libya's far south
0
National renewables target by 2035
0
PPA horizon our projects are structured for
The Resource

One of the strongest solar belts on earth.

≈ 2,000 ≈ 2,200 El Sadada ≈ 2.0 GW assessed Ghadames ≈ 200 MW assessed Brak El Shati ≈ 2.7 GW assessed Tripoli ≈ 1,950 kWh/m² Sebha ≈ 2,200 kWh/m² Al-Kufra ≈ 2,450 kWh/m² Coast Deep south Annual irradiation — brighter is stronger State-demarcated solar sites — REAOL / GIZ national programme

Annual irradiation climbs from roughly 1,950 kilowatt-hours per square metre on the coast to nearly 2,500 in the far south — with more than 3,000 hours of sun a year and cloud cover among the lowest measured anywhere. A photovoltaic panel installed in Libya produces close to twice the energy the same panel yields in northern Europe. That resource is what we are building this division on — for the grid, and for the rooftop.

Three zones have already been demarcated by the state for utility solar — El Sadada, Ghadames, and Brak El Shati — assessed under the REAOL / GIZ national programme at close to five gigawatts of combined capacity, each sited beside existing grid infrastructure. The programme's own prefeasibility work prices generation on these sites at 2.0–2.5 euro-cents per kilowatt-hour.

Sources: SolarGIS long-term data; World Bank site measurement; REAOL / GIZ site demarcation studies (2025); published Libyan resource studies.

The Case

Peak demand meets peak sunshine.

01 — The Load

A daytime peak

Libya's demand peaks in the hottest hours of the afternoon — met today by gas and diesel units running on subsidised fuel, with household generators filling every gap.

02 — The Fit

Solar on the same curve

Solar output rises and falls with the same sun that drives the load — peak production lands inside peak demand, displacing the most expensive megawatt-hours first: about 1.8 terawatt-hours a year from every gigawatt installed.

03 — The Exchange

Fuel spending, exchanged for generation

Libya's energy subsidies reached an estimated USD 17 billion in 2024, much of it burned generating electricity — spending that can procure solar capacity instead of fuel, year after year. Making that exchange is what this division was set up to do.

The Point

Why we keep talking about subsidies.

Electricity reaches the Libyan home at a token tariff. The real cost — imported fuel, refined crude burned in power stations, gas held back from export — is carried by the state, year after year. That is why subsidies run through this page: every kilowatt-hour generated from the sun is a kilowatt-hour the treasury no longer has to fuel, which makes solar one of the few investments that is fiscally positive for Libya from its first day of operation. It is also why we work on distributed systems alongside the grid — a rooftop that outperforms a generator saves the household and the state at the same time.

The Citizen

Electricity Libyans can count on — homes and businesses powered through the day and the night, with the blackout no longer a fact of daily life.

The State

Power at its true low cost, in place of a subsidy bill the treasury cannot sustain — every solar kilowatt-hour delivered is a net fiscal gain.

The System

Structures where the citizen, the state, and the investor each come out ahead. If it's not good for everyone, we don't take it.

The Agenda

What we are building.

01 — Utility Scale

A pipeline of grid-scale plants

We are developing grid-connected solar in the 100-megawatt reference class — carrying each site through development, permitting, and construction with our own team, and bringing in infrastructure finance and partners like DAS Solar and PowerChina where the scale calls for it. The state signs the offtake and pays only for power delivered.

02 — Distributed

A national rooftop programme

We are preparing household and commercial solar at national scale — quality-assured systems, a certified Libyan installer network we are training, and financing designed so a rooftop beats a generator on cost. Built to deploy in the thousands.

03 — Captive Power

Solar for industry and the field

We are bringing solar and solar-hybrid plants to industrial sites and oilfield operations — cutting diesel hauled to remote locations and freeing gas back to the grid, with our oilfield services division carrying the ground work.

Delivery

How we take a site to power.

Site & Resource

Measurement and land

Studies & Grid

Yield, interconnection, ESIA

Offtake & Permits

State PPA and approvals

Financial Close

Debt and equity

EPC Build

12–18 months

Operations

15–20 years, Libyan O&M crews

Bankability

What we put in front of lenders.

Contract

We build every project to the state's offtake framework — 15–20 year power purchase agreements granted by the authorities, with the defined payments, indexation, and arbitration terms global solar finance already knows.

Security

We design payment security and step-in arrangements to the standards of development finance institutions and export credit agencies.

Land & Grid

We work within state site-demarcation programmes and utility interconnection processes, with grid studies carried out to code.

Delivered With

DAS Solar and PowerChina — our technology and EPC partners in Libya.

Tier-one n-type photovoltaic module technology from DAS Solar, and engineering and construction delivery from PowerChina, one of the world's largest power infrastructure groups — every project structured to Libya's national target of 4 GW of renewables by 2035.

DAS Solar PowerChina Guizhou Engineering Co., Ltd
HSE, Quality & Compliance

The standards we work to.

Safety, environmental care, and quality are managed through one system across the group. This page sets out the commitments we work to and the standards that system is built against.

The Commitments

What we commit to.

Stop-Work Authority

Anyone on a Ghibli worksite — our people, a client's, or a subcontractor's — can stop work they believe is unsafe, without needing permission and without repercussions. Work resumes once the risk is addressed.

Fit & Competent

People are assigned only to tasks they are trained, rated, and medically fit for, with competency checked before mobilisation.

Journey Management

Road transport carries some of the highest risk in Libyan field operations. Field movements follow an approved journey plan covering routes, drivers, vehicles, and check-ins.

Permit to Work

Hot work, confined-space entry, lifting operations, and energy isolation are carried out under a permit-to-work system, with controls checked at the worksite before the job starts.

Report & Learn

Near misses and incidents are reported openly, investigated to root cause, and closed out with corrective actions. Reporting is encouraged, not punished.

Protect the Environment

Spill prevention, waste segregation and tracking, and site restoration are included in the planning of every scope of work.

Quality

How we manage quality.

Quality on an oilfield scope is demonstrated through documentation: inspection and test plans, material traceability, calibrated equipment, and complete handover records.

Management system. Our integrated management system is being developed to the requirements of ISO 9001, ISO 14001, and ISO 45001, with the relevant API specifications applied on well-service scopes. Certification is on our roadmap, and we do not claim it before it is achieved.

Suppliers. Suppliers are assessed before award and monitored through delivery. Where we can, we qualify and develop Libyan vendors so that more of the supply chain can be audited in-country.

Sustainability & ESG

Environment, social, governance.

As the group's renewable projects move toward financing, environmental and social practice across Ghibli is being aligned with the IFC Performance Standards — the framework international lenders apply to projects of this kind.

Environment. Our renewables division adds clean generation and reduces diesel use; on oilfield scopes we manage flaring, spills, and waste under each client's requirements and our own procedures.

Social. We are a Libyan company and hire Libyan first, with training and competency development written into our mandates. We work to grow the number of domestic suppliers able to meet international standards.

Governance. Clear ownership, documented decision-making, and the compliance commitments set out below.

Ethics & Compliance

Our compliance commitments.

Anti-Bribery & Corruption

We prohibit bribery in any form, including facilitation payments. Gifts and hospitality are modest, transparent, and recorded. Our programme follows the principles of ISO 37001.

Third Parties

Agents, subcontractors, and partners are subject to due diligence before engagement, including sanctions screening of counterparties.

Conflicts of Interest

Conflicts of interest are declared when they arise and managed in writing.

Raising Concerns

Employees, suppliers, and clients can raise concerns in confidence, directly with group management or by email to info@ghiblienergy.ly, and without retaliation.

Newsroom

News & updates.

Milestones from across the group — programmes, partnerships, and where to find us next. For media enquiries, write to info@ghiblienergy.ly.

Announcements from across the group will be published here as programmes and partnerships are made public.

Careers

Careers at Ghibli Energy.

We are building Libyan crews, engineering teams, and support functions as our programmes mobilise, with structured training part of every role. We welcome CVs ahead of need.

Who We Hire

Four kinds of people.

01

Field & Well Services

Supervisors, operators, and technicians across drilling support, completions, wireline, and surface testing.

02

Engineering

Reservoir, production, E&I, civil, and project engineers.

03

HSE & Quality

Site and systems roles across health, safety, environment, and quality.

04

Commercial & Development

Project development, contracts, and analysis across the three divisions.

Training & development. Structured on-the-job training, defined competency requirements for each role, and work alongside international partners on live projects.

How we hire. Selection is based on capability and references. Applications are reviewed as roles open, and we keep strong candidates on file.

Contact

Start the conversation.

Whether you are an international group entering Libya or a Libyan institution with a project to deliver, we would like to hear from you.

Headquarters

Al Burj Street, Hai Al-Andalus
Tripoli, Libya

General Enquiries

info@ghiblienergy.ly

Web

ghiblienergy.ly